bathroom renovation
manny asked:


I’m renovation the second floor of my home 4 bedrooms, 2 baths, new dry wall, flooring, windows, bathroom fixtures(shower, sink, and toilet) and electrical and paint, Contractors said it would take two and a half months, its going on four months and theyre no even half way done?