bathroom renovation
Mungbeans asked:


I am (with much trepidation) co-ordinating my own bathroom renovation. I will be using skilled tradesmen but I just need some tips on how to get everything scheduled so it goes smoothly.

I need a list of items I will need to consider, preparing the budget, tasks to tick off, when to start which item.

I have the style and materials picked out, just need to get the project management under control.
We are pretty set on what we want done, and it should be pretty straight-forward. We need to demolish and re-install:
a) shower - current one was leaking and is no longer in use. It will be replaced with a new shower unit (floor, walls, glass)
b) bath - being removed and a new one put in its place
c) vanity and cupboards - being ripped out and moved to another area.
d) The toilet is a separate room and all that needs doing there is re-tiling
e) Shower and bath fixtures will remain almost in the same place. Only plumbing that needs to be moved is the pipes for the vanity basin.